Basic Daily Report
WSJ Enterprises, LLC • 1283 County Road 75, Lafayette, AL 36862
Date
Tuesday, September 22, 2026
Status
APPROVED
Template
Basic Daily Report
Project
Ridgeline Materials — Plant 2 Expansion
Weather
Partly cloudy
Temp (°F)
78
Worker Hours
88 (OT 6)
Equip Hours
16
General Conditions
Schedule delays
Weather impact
Accidents on site
Injuries reported
Embed plates at line 4 held pending RFI-017. Ironworkers moved to roof joists in bays 1–3.
Weather
Time
Condition
Temp
Precip %
Wind
Humidity %
7:00 AM
Clear
64°F
0
3 mph
78
12:00 PM
Partly cloudy
78°F
10
8 mph
55
4:00 PM
Partly cloudy
76°F
20
9 mph
52
Crew / Trades (4)
Trade
Subcontractor
Crew
Hours
OT
Work
Ironworkers
—
6
8
1
Roof joists and bridging, bays 1–3
Welders
—
2
8
0
Moment connections, line C
Crane operator
Ridgeline Crane
1
8
0
Joist picks, bays 1–3
Laborers
—
2
8
0
Shake-out and cleanup
Production (2)
Type
Quantity
Unit
Notable Issues
Joists set
42
EA
—
Bridging
380
LF
Short 40 LF at bay 3
Equipment (2)
Equipment
Operator
Hours
Crawler crane
R. Hale
9
Telehandler
L. Moss
7
Material Deliveries (1)
Supplier
Material
Qty
Time
Received By
Bayline Joist
Roof joists, bay 4
18 EA
10:40 AM
D. Carter
Activity Log (3)
Time
Activity
Description
Personnel
7:00 AM
Safety meeting
Crane pick plan for bays 1–3
All crews
9:15 AM
Hold
Embed plates at line 4 held pending RFI-017
D. Carter
2:30 PM
Inspection
Bolt tightening checked at line C
Special inspector
Photos (4)
4 photo(s) attached.
Sign-off
D. Carter
Signature
9/22/2026
Date
01Status

Follow one report

A report goes from the person who wrote it to the person who decides on it, and every step is recorded against the report.

Daily Report · Sep 22, 2026DRAFTSaved
Worker Hours
88 hrs
Entries
12
Submit
Basic Daily Report
WSJ Enterprises, LLC • 1283 County Road 75, Lafayette, AL 36862
Date
Tuesday, September 22, 2026
Status
DRAFT
Template
Basic Daily Report
Project
Ridgeline Materials — Plant 2 Expansion
Weather
Partly cloudy
Temp (°F)
78
Worker Hours
88 (OT 6)
Equip Hours
16
General Conditions
Schedule delays
Weather impact
Accidents on site
Injuries reported
Embed plates at line 4 held pending RFI-017. Ironworkers moved to roof joists in bays 1–3.
Weather
Time
Condition
Temp
Precip %
Wind
Humidity %
7:00 AM
Clear
64°F
0
3 mph
78
12:00 PM
Partly cloudy
78°F
10
8 mph
55
4:00 PM
Partly cloudy
76°F
20
9 mph
52
Crew / Trades (4)
Trade
Subcontractor
Crew
Hours
OT
Work
Ironworkers
—
6
8
1
Roof joists and bridging, bays 1–3
Welders
—
2
8
0
Moment connections, line C
Crane operator
Ridgeline Crane
1
8
0
Joist picks, bays 1–3
Laborers
—
2
8
0
Shake-out and cleanup
Production (2)
Type
Quantity
Unit
Notable Issues
Joists set
42
EA
—
Bridging
380
LF
Short 40 LF at bay 3
Equipment (2)
Equipment
Operator
Hours
Crawler crane
R. Hale
9
Telehandler
L. Moss
7
Material Deliveries (1)
Supplier
Material
Qty
Time
Received By
Bayline Joist
Roof joists, bay 4
18 EA
10:40 AM
D. Carter
Activity Log (3)
Time
Activity
Description
Personnel
7:00 AM
Safety meeting
Crane pick plan for bays 1–3
All crews
9:15 AM
Hold
Embed plates at line 4 held pending RFI-017
D. Carter
2:30 PM
Inspection
Bolt tightening checked at line C
Special inspector
02The template

What goes on a report

The default template has a section for each part of the day, and the report totals the worker hours and entries as it is filled in.

General conditions
Four flags for the day: schedule delays, weather impact, accidents on site and injuries reported, with space for notes.
Weather
Readings through the day with the time, condition, temperature, chance of rain, wind and humidity.
Crew & trades
Each trade and subcontractor with crew size, hours, overtime and the work done.
Production
Quantities put in place by type and unit, with any notable issues.
Equipment & deliveries
Machines with their operator and hours, and materials with the supplier, quantity, time and who received them.
Activity log & sign-off
A timed log of what happened and who was involved, then the attached photos and a signature.

Photos →Production & timeline →Everything in the field →

The jobs it runsBridgestoneKiaHyundaiLGNovelisTotoToyo TiresCytiva

A product of WSJ Enterprises, LLC · 1283 County Road 75, Lafayette, Alabama

TermsPrivacy[email protected]